UPDATE: To accomodate some one else’s schedule, it looks like Sunday, July 21, 2024 around noon will be the date.
I haven’t had the place or time to brew since I moved. The main problem was a burner.
I bought a 5KW induction burner. It should get things up to temp pretty quickly. I added a 30A 240V circuit in the garage for it.
I still need to do some equipment updates and checks. Immersion chiller is the biggest question mark at the moment. The old one worked well enough if I pumped ice water through it. That’s gonna be harder in the garage.
No date and time yet. I need to make sure I have everything I need and work out the chiller part.
Starting with a recipe I’ve done before but have reworked it slightly. Keep it simple. Do one brew, take measurements, and try the same recipe again. Make any needed adjustments on the second.
I have a good reverse osmosis system. Last I checked I had 9ppm of ‘whatever was left’ in the water. I’ll assume that is mainly salt from the softener. Close enough to distilled for water for adjustment purposes though. I have to work out my water additions for the pH and flavor adjustments. I’m not a fan of hop bitterness so I may tilt it a little towards the malty side.
I picked up enough for two brews of this today at the Pumphouse in Struthers. Hopefully I won’t have to do too much adjustment on the second brew. I have a fence to build so having a blonde ale on tap will help a lot with that.
I think tomorrow I’ll set up the equipment in the garage just to make sure I have everything and kind of get an idea on what I’ll need to do.